Skip to main content


New project started yesterday. This will eventually be a slightly ornate house number panel to put in front of the new letterbox. #blacksmith #metalwork
in reply to David de Groot ๐“†‰

Todayโ€™s progress. I pulled something in my left shoulder this morning so the forging time was reduced to the point where it started bothering me.

However, I got the 9 done and started on the bottom curly bit.

#blacksmith #metalwork #decorative
in reply to David de Groot ๐“†‰

This scroll isnโ€™t quite finished but itโ€™s nearly there. Had to use the hand cranked blower as we had no power to run the electric one.

#blacksmith #metalwork
in reply to David de Groot ๐“†‰

More progress today. A lot quicker when you have electricity to run the electric blower.

Fixed up the bottom scroll and have done on of the top ones (although I need to attach the branches yet); still need to make a 2nd identical but mirrored top scroll.

#blacksmith #metalwork #decorative
in reply to David de Groot ๐“†‰

All the forging is done. Now I just need to paint it and itโ€™ll be ready to install.

I opted to wire-wrap the curly bits on, could have used hot collars, but wire wrap is also ok.

#blacksmith #metalwork #decorative
in reply to David de Groot ๐“†‰

Painting had commenced. First a primer coat, then the black. Iโ€™ll finish with a clear coat for extra protection.
in reply to Kate

I noticed, too late that autocorrect struck on my post too. Had should be has.
in reply to David de Groot ๐“†‰

A quick test install of the finished product with the letterbox placed behind.

The letterbox is awaiting installation from the electrician that destroyed the last one (pending a slab).

#blacksmith #metalwork #decorative

Lo, thar be cookies on this site to keep track of your login. By clicking 'okay', you are CONSENTING to this.

โ‡ง